• EN
    • RU
logo
  • Who we are
  • Sectors
    • Renewables
    • Nuclear
    • Grids
    • Hydrogen
  • Projects
  • Services
  • Career
  • Newsroom
  • Contact
  • EN
    • RU

Renewables

Hybrid Power Plant Project in the Navoiy Region

Preliminary Overhead Transmission line route selections for a 1,5 GW wind power plant in Kungrad

Geotechnical site characterization studies for 1000 MW Bash and Dzhankeldy OHTL

Aerial view of a solar power plant

Engineering studies for 220 MW Jizzakh and Samarkand solar power plants

Wind turbines farm on a mountain

Geotechnical, topographical and hydrological investigations for a 100 MW wind farm project in Nukus, Karakalpakstan

Local Technical Advisor mission for a 100 MW wind power plant project in Karatau region

Impact studies and siting for the construction of a photovoltaic plant in the Kingdom of Saudi Arabia

Grid impact assessment and engineering design consultancy for a 200 MW solar power plant in Navoiy Region

Grid impact study for the implementation of a 600 MW wind farm in the Bukhara region

Site investigation: topographical, hydrological & geotechnical surveys for the Bash and Dzhankeldy wind power plants

Contact

Contact us by email

Contact us by phone:
+998 90 0021392

Location

Shahrisabz street, block 5A 100060 Mirabad district,
Tashkent city

Follow us

Privacy Preference Center

Privacy Preferences