Preliminary Overhead Transmission line route selections for a 1,5 GW wind power plant in Kungrad

Project presentation

The proposed 1500 MW Kungrad Wind Farm is located in Kungrad district of Uzbekistan.

The Wind Farm shall evacuate the power in the 500 kV Uzbekistan network through an Overhead Transmission Line from Kungrad Wind Farm to Sarymai 220 kV substation and consequently to Karakul substation transmission network. The proposed 1500 MW project is divided into 3 X 500 MW wind and 3 X 100 MW BESS (connected at MV terminal of wind farm substation).

In this context, the client requested UzAssystem to conduct preliminary OHTL route selections between the 1.5 GW Kungrad wind power plant to a grid.

Project scope

Preliminary OHTL routing

Methodology for Overhead line route selection

IBAT desktop survey

Approval process of the route selection

Site Visits

Overhead Line Route Approval from Authorities (i.e. JSC “NEGU” etc.)

Construction of a 500 kV overhead line with a length of 2x249 km

Construction of 2 bays by expanding the 500 kV in the Karakul substation

Construction of a 500 kV overhead line with a length of 1x242 km

Construction of 3 bays of 500 kV by expanding the the AIS outdoor in the switching station "Sarimay" (Khorezm) which is considered to be transformed into a 500 kV Sarymay substation by JSC “NEGU”

Client Benefits

Benefits of an economically efficient electricity market

Identifying transmission projects that provide access to electricity at the lowest total electric system cost

Reliability and efficiency of energy delivery in the region

UzAssystem initiates approval process from Authorities i.e. JSC “NEGU”

Approvals from other authorities like Hakeeiyat, Cadastral Agency etc.

UzAssystem provides assistance if any required

Making and / or recommending changes deviating from PUE Uzbekistan, GOSTs

6000

Employees

Change the color to match your brand or vision, add your logo and more.

15

Countries

Change the color to match your brand or vision, add your logo and more.

500

Million €