EPC tender preparation, detail engineering controls and site supervision

Project presentation

On the basis of the Presidential Decree №113, dated 03.02.2022, of the Republic of Uzbekistan “On Measures to implement the project on the transformation of the electricity sector and sustainable transmission of electricity with the participation of the World Bank, and to develop and increase the efficiency of the transmission grid System“.

The client initiated a tender for development of design and estimate documentation – “Reconstruction of Air-Insulated Switchgear (AIS) with a voltage of 35-110-220-500 kV with replacement of physically obsolete electrical equipment.

The scope covers the preparation of an EPC tender, detailed design control, site supervision and acceptance works. JV UzAssystem LLC was recognized as the winner on cost and quality based tender.

Project scope

The scope of work includes the following activities:

Tendering dossier preparation

Technical bid evaluation

Assistance on modernization of substations and implementation of better standards with higher efficiency

Site supervision of contractor

Datasheets, material requisitions technical specifications, design calculations preparation

Review of contractor designs

MFS (Minimum Functional Specification) document preparation

Clients Benefits/Results

Sustainable transmission of electricity

Transformation of the electricity sector

Application of better standards with higher efficiency

Improving system availability and reliability by application of modern international standards

Decrease of transmission losses on the grid

6000

Employees

Change the color to match your brand or vision, add your logo and more.

15

Countries

Change the color to match your brand or vision, add your logo and more.

500

Million €

Change the color to match your brand or vision, add your logo and more.

Contact us


UzAssystem teams are at your disposal for any questions or additional information.

A question? A project?Join us