Consultancy and project management for the modernization of the design of electricity transmission and distribution networks in Uzbekistan

Context

Uzbekistan is a developing country, growing at 7% per year with a population of over 32 millions.
To support this strong growth, Uzbekistan must both increase its electricity production capacity and rapidly modernize its electricity grids. The design of those networks dates back to the Soviet years and changed only slightly after 1991. The country also wants to integrate new intermittent (renewables) and basic (thermal and nuclear) electricity generation facilities into its energy mix.
The country’s Ministry of Energy has a main design office available, which does not yet benefit from technical references neither modern design resources to meet this challenge.

The Ministry of Energy of Uzbekistan called upon UzAssystem to operate as an international partner to facilitate the energy transition of the country and to support the National Center of Engineering of Electric Distribution and Transmission.

Mission

Updating of the electrical standards by the establishment of a college of international technical experts with Uzbekistan representatives:

Analysis of existing standards with current international standards (GOST, IEC, ISO, I3E) and their eventual applications in Uzbekistan

Main equipment and scope: low voltage 400V to high voltage 500 kV, circuit breakers, transformer stations, towers, overhead lines, etc.

Deployment of new means of electrical design (calculations, 3D, etc.)

Setting up and management of a new entity dedicated to electrical transmission and distribution studies, in partnership with the National Engineering Centre, on the basis of the new defined standards and to anticipate the implementation of new communication as well as remote control systems of SCADA type

Implementation of new means of IT infrastructures and project management

Clients Benefits

Bring future and existing installations up to the international standards through access to the updated standards and to international experts in electrical networks

Improving system reliability through the facility standards update

Design optimization, construction lead times and reduction of CAPEX / OPEX thanks to the reshaping of the engineering approach with the use of new tools and thanks to the standards modernization

Support the political will to strengthen the country's position as a major player in power generation and distribution in the Central Asian region

6000

Employees

Change the color to match your brand or vision, add your logo and more.

15

Countries

Change the color to match your brand or vision, add your logo and more.

500

Million €

Change the color to match your brand or vision, add your logo and more.

Contact us


UzAssystem teams are at your disposal for any questions or additional information.