Zafarabad Substation and the Extension of Syrdarya Substation Design Studies

Project presentation

The construction of greenfield 220/110/10 kV Zafarabad substation, and the extension of Syrdarya substation by two 220 kV line bays project has been initiated by the National Electric Grid of Uzbekistan (NEGU) and Asian Development Bank (ADB). The design for Zafarabad substation shall be of digital substation type, applying IEC 61850 standard communication between protection and Intelligent Electronic Devices and station level components.

A 220 kV double-circuit overhead transmission line will connect the above two substations. The works for the construction of the Syrdarya – Zafarabad 220 kV double-circuit transmission line will be tendered separately.

In this context, the client requested UzAssystem to perform design works for the Zafarabad substation.

Project scope

Detailed Design and Engineering studies of greenfield 220/110/10 kV Zafarabad substation, and the extension of Syrdarya substation by two 220 kV line bays project including insulation coordination, as per technical specifications, relative government Authority requirement and GOST Standards & Specifications

Dynamic Analysis Study

Detail civil design i.e Control Room building Structure and Foundation design Residential house Civil design, Warehouse building Gate house and Residential house design etc.

Geotechnical Report Zafarabad substation, and the extension of Syrdarya substation

Topographical Study Zafarabad substation, and the extension of Syrdarya substation

Hydrological Study Zafarabad substation, and the extension of Syrdarya substation

Clients Benefits/Results

Safety

Reduced substation footprint

Interoperability

Reduces copper cabling

Ease of configuration

Maximum reliability and availability

Real-time performance

Smart Grid communications capabilities

Reduces cost of ownership

6000

Employees

Change the color to match your brand or vision, add your logo and more.

15

Countries

Change the color to match your brand or vision, add your logo and more.

500

Million €

Change the color to match your brand or vision, add your logo and more.

Contact us


UzAssystem teams are at your disposal for any questions or additional information.

A question? A project?Join us