Hybrid Power Plant Project in the Navoiy Region

Project presentation

The Hybrid Power Plant project covers a total area of approximately 15 km² and situated between the Kanimekh and Nurata Districts in the Navoiy Region of Uzbekistan. 

Hybrid Power Plant includes:

  • 300 MW of wind energy (situated on ~10 km² area and includes around 48 wind turbine generators),
  • 120 MWp of photovoltaic energy (situated on ~3.2 km² area),
  • 200 MWh battery energy storage system.

To undertake the construction of this energy project, the client mandated UzAssystem to conduct site characterisation, grid impact assessment and overhead line (OHL) routing studies.

Project scope

1- Site Characterisation Studies:

Geological & Geotechnical Investigations

Topographical Studies

Hydrological Studies

2- Grid Impact Analysis Studies:

Prefeasibility Study

Power Evacuation Study

Stability Study 

3- Overhead Line Route Selection Studies

Client Benefits

Accurate and precise information about the site conditions as per best practices and international norms and standards to make accurate estimation about their future investment

Understanding of availability of the grid of Uzbekistan and best, feasible, economical connection point for their power plant

Most feasible and economical OHL routing between the connection point which is determined by grid impact assessment of UzAssystem and power plant

6000

Employees

Change the color to match your brand or vision, add your logo and more.

15

Countries

Change the color to match your brand or vision, add your logo and more.

500

Million €

Change the color to match your brand or vision, add your logo and more.

Contact us


UzAssystem teams are at your disposal for any questions or additional information.

A question? A project?Join us